Case Study: Limestone Quarry Reedbed filtration systems for industrial use
A limestone quarry was unable to excavate further because of complaints of run-off water being polluted.

Samples were taken for passing through my test beds at home. I like to test how well my reedbeds work with any new water pollution. This “pollution” was nothing more than ground limestone, fine particulates dissolved in water. There are no problems with ammonia, nitrates phosphates, metals or other minerals.


My tests showed the following:

These results allowed the quarry to carry on excavating 62.5million tons of limestone.

"It costs nothing to call to have a chat about waste water problems. Between us we should be able to find solutions, and save a few bob in the process. No heavy sales pitch. I always leave you with time to consider your options.
Always happy to offer free advice"